slide-small-gas.jpg

News

Previous Next
FSG Opens Access To 24 Hour Helpdesk Service Jan 20, 2012 National property maintenance provider Facilities Services Group (FSG) has extended its out of h... Read more
FSG Launches TM44 Service Facilities Services Group Launches TM44 Service National property maintenance provider Facilities Services Gr... Read more
FSG and British Waterways Join Forces to Deliver New Online Health and Safety Initiative September 26, 2011   FSG and British Waterways Join Forces to Deliver New Online Health and Safety Init... Read more
FSG Oversees Maintenance at Falkirk Wheel Aug 10, 2011 FSG Oversees Maintenance Works At Landmark Falkirk Wheel   National property maintenance ... Read more
Facilities Services Group Appoints UK Development Manager Aug 1, 2011 Facilities Services Group Appoints UK Development Manager National property maintenance provider... Read more
FSG Secures Swinton Deal July 12, 2011 Facilities Services Group Secures Swinton Deal National property maintenance provider Faciliti... Read more
PRESS RELEASE - Facilities Services Group Undergoes MBO  Feb 24, 2011   Facilities Services Group Undergoes MBO   The management team at national p... Read more
Press Release - Facilities Services Group Acquires Spice Gas November 30, 2010   Facilities Services Group Acquires Spice Gas   National property maintenance... Read more
Press Release - FSG Steps Up Reactive Maintenance  September 27, 2010   Facilities Services Group Steps Up Reactive Maintenance   National pr... Read more

Case Studies

Gondola

Download case study

Lamp Replacement

FSG successfully completed an energy saving project for one our retail clients. Our primary goals were to reduce site energy consumption and prolong lamp life with minimum disruption to service at site. The secondary benefits were to reduce energy costs and lower the heat output of the lighting (avoiding unnecessary draw on HVAC system.)

  • Client: Gondola
  • Site: Pizza Express, Euston Road
  • Property Type: Restaurant
  • No. of Lamps: 73
  • Technology used: Multiple Type Reduced Watt Retro Fit RC
  • Lamps by Osram
  • Energy Measurement: Smart Metre installed at site

Key Objectives

  • Energy Reduction
  • No Compromise to Luminescence
  • Longer Lamp Life
  • Payback Within First Financial Year
  • Heat Output Reduction
  • No Disruption to Service

Key Results

  • Lamp Wattage Reduced by avg 15w/19% Energy Saving
  • IRC Technology led to no loss of Luminescence
  • Increased lifespan of each lamp by 1000 hours (33%)
  • Energy Costs reduction run rate for year one £667.23
  • 8 Month Full Payback (includes install)
  • 30% Lamp Heat Reduction
  • Re-fit Carried out in-hours prior to Customer opening

Ecubes

FSG also sought to reduce our clients energy bills by looking into solutions for equipment that is in constant use and where the biggest reductions could be made. The installation of the Ecubes in the refrigeration units on site can be completed in a very cost and time efficient manner and the results can be seen instantly with no changes to the temperature and functionality of the refrigeration unit.

  • Client: Gondola
  • Site: Pizza Express, Baker Street
  • Property Type: Restaurant
  • No. of refrigeration units: 1 x cold room, 1 x walk-in freezer
  • Technology used: E-Cube
  • Energy Measurement: Kw meter readings

Key Objectives

  • Energy Reduction
  • No Compromise to Refrigeration levels
  • Fast Pay Back Period
  • No Disruption to Service

Key Results

  • Sample week without Ecube fitted: 147.69Kw used
  • Week with the Ecube fitted: 81.52Kw used
  • First week savings 66.17Kw = £5.29
  • Yearly saving based on 52 weeks 3,440.84Kw = £275.26 (Based on 1Kw = £0.08 )

Oven Timers

Another project we undertook was to reduce the amount of energy used by the pizza ovens. This project entailed timers being install at the restaurant which controlled when the ovens were able to be switched on. By reducing the amount of time the ovens are on by 2 hours a day we were able to cut the energy bills by £12.91 per week.

  • Client: Gondola
  • Site: Pizza Express, Baker Street
  • Property Type: Restaurant
  • Equipment Type: Oven
  • Technology used: Timing Unit

Key Objectives

  • Energy Reduction
  • Fast Pay Back Period
  • No Disruption to Service
  • Less draw on HVAC as oven on-time reduced

Key Results

  • 1 week without the timer recorded 1019.4kwh of electricity for the Pizza oven - £122.23 @ 8.38p
  • 1 week with the oven timer recorded 911.1kwh of electricity for the Pizza oven - £109.32 @ 8.38p
  • Saving for the week is 108.3kwh of electricity for the pizza oven - £12.91 @ 8.38p
  • Saving for the year based on the above is 5631.6kwh of electricity for the Pizza oven - £671.32 @ 8.38p
  • (8.38p is a preset tariff)

HVAC Replacement

Another service we can offer is to replace existing HVAC units with a new replacement inverter systems. This is a long term energy saving solution as the existing HVAC units need to be replaced but the new inverter system can save up to 75% on energy costs without compromise on delivery.

Replacement Technology Results

  • No Loss in capacity
  • Standard Products
  • Fast installation with reduced costs
  • Energy savings
  • Reduced maintenance costs
  • Reduced down time in retail environments.
  • Choice of control solutions to ensure ease of use to suit all applications.

Case Study

  • Based on 2 x 12.5 kW cassette units
  • Annual running costs for a standard system £3,918.08
  • Replacement Technology costs for year 1 £6,315.50*
    *This cost includes for the new equipment, installation and the first years running costs (running costs £1,635.50).
  • 2 year pay back period on installing the replacement technology.

Window Tinting

Window tinting is another service which we can offer, this is something that can reduce the CO2 emissions and reduce your company's Carbon Footprint. The window tinting technology rejects up to 65% of solar energy which greatly reduces the heat input through the glass whilst still allowing natural light into the room. By reducing the heat generated through the windows this in turn reduces the draw on the HVAC system as you no longer have hotter “peak” times throughout the day.

Window Tinting Results:

  • Reduces CO2 Emissions
  • Saves up to 25% of cooling costs
  • Saves up to 5% of total energy costs
  • The building will not change in appearance
  • Reduces Carbon Footprint
  • Positive return on investment
  • Minimal disruption during installation
  • No special maintenance requirements

Tips for Saving Energy Saving

  • Ensure temperatures are set at no more than 19 degrees
  • Thermostatic radiators should be left at position 2-3
  • Keep doors and windows closed when the heating is on
  • Ensure radiators are not blocked with furniture
  • Avoid heating unused spaces such as corridors and storerooms
  • Update changes in building occupation
  • Report any factors which effect comfort levels such as draughty windows and doors
  • Switch off lighting in empty rooms
  • Use daylight where possible
  • Only use required lights
  • Ensure outside lights are only used when necessary
  • Switch off computers when not required
  • Don’t leave equipment on standby mode
  • Purchase energy efficiency rated equipment when replacing items
  • Don’t leave taps dripping
  • Ensure water temperatures are set correctly

John Swires

John Swire & Sons was established in 1816 in Liverpool. They are now global, trading in 5 continents and employing in excess of 125,000 people worldwide.

Their headquarters are in London and operations range from shipping, cold storage, road transport and agriculture, through to property development, aviation, beverages and waste management. Our sister company, Inenco, were retained by John Swire to advise them on the optimum solution to solving their comfort cooling problems. Regulatory, environmental and financial considerations all needed to be taken into account.

THE PROJECT

The design, supply, installation and commissioning of a VRV comfort cooling system.

THE CHALLENGE

  • Swires' offices occupy 6 floors of a 1980's building located in central London. Over the years, the internal layout of offices has changed, but the HVAC system has not been updated or adapted to suit resulting in:
  • Reduced energy efficiency
  • Original design and required comfort levels not being met
  • Increased maintenance costs
  • Difficulty in sourcing spare parts

THE SOLUTION

FSG supplied and installed a roof mounted VRV heat recovery plant connected to nine indoor heating/cooling systems serving the entire internal space.

The installation included all electrical and control cabling and builder's work governed by an Intelligent Management System controlling energy usage and environmental conditions.

THE IMPLEMENTATION

  • A detailed design and specification were compiled to ensure best value was achieved
  • A programme of works was agreed before commencement of the contract
  • All installation work took place outside normal working hours

THE BENEFITS

  • The equipment installed qualified for enhanced capital allowances and 5 years parts and labour guarantees
  • Significant savings in running and maintenance costs are being achieved
  • A more comfortable working environment through flexibility of temperature control
  • The system was installed without disruption to client's staff
  • By using only directly employed operatives, FSG were able to control the quality of the workmanship and ensure the contract was delivered on time